the assurance of Dutch expertise
> Home > Maintenance > Tank Terminal

Tank Terminal

For Tank Terminal, we overhauled two Ruhrpumpen pumps. The first pump was disassembled on-site, leaving the lower housing in place. The shaft was overhauled in the Roodhart workshop, including the bearings, mechanical seals and wear rings. Following the cleaning of the casings, everything was reinstalled. The second pump was fully overhauled in the workshop.

Photos Tank Terminal