Power Recovery Train at an oil refinery

n 2013, the Roodhart Group was involved in a large project at a refinery in Rotterdam. The project consisted of a major overhaul on the Steam turbine and the axial / radial compressor. In addition, an inspection on the gearbox and the complete renewal of the suction filters of the axial / radial compressor. During the stop, the old expander was also completely replaced by a new expander, which was equipped with a base frame to perform everything in a shorter period of time. Roodhart was represented by a team of about 60 men who completed the entire project in 2 shifts over 4 weeks.