We have carried out a complete overhaul of a vertical centrifugal pump for an oil terminal. We have carried out this project for the client from disassembly on location to recommissioning. The pump was completely cleaned, disassembled and inspected in our workshop in Rotterdam.
All critical parts have been checked, cleaned or replaced. After overhaul, Roodhart coordinated the installation of the pump on location and all systems were reconnected.